Dry Dock X7: Dry Docking Software for Dry Dock and Shipbuilding Projects
Dry Dock X7 is dry docking software that lets you plan, execute and analyse dry-dock and shipbuilding projects end to end, in one system. Templates, Gantt charts, budgets and quote comparison keep cost and time under control, and mobile apps that work offline put real-time data from the yard in front of every decision.
- Class surveys
- SOLAS bottom surveys
- BWM Convention
- EEXI & CII
- SIRE 2.0
- RISQ 3.2
- TMSA 3
- DryBMS
- Unlimited dry-docking and shipbuilding projects
- Offline mobile apps with online sync
- Part of Marine X7, used on 2,200+ vessels


All merchant ship types
- Oil, product and chemical tankers
- LNG and LPG carriers
- Bulk carriers
- Container ships
- Car carriers (PCTC and ro-ro cargo)
- General cargo and multipurpose ships
Used by technical superintendents and ship's staff in the yard, and by technical managers and other stakeholders ashore.
How Dry Dock X7 works
- We set up everything with your historical databases and files, so it is plug-and-play from where you left off in your last software or Excel.
- Superintendents build the specification from templates and a standard jobs library, and plan the workload on Gantt charts.
- Quotes are compared against budget, and ad-hoc requests are approved in the system as the docking runs.
- Progress, certificates and pictures are recorded on mobile apps in the yard, offline if needed, and the office sees real-time cost and progress.
Every dry dock now carries more regulation, more scope and more scrutiny
A dry dock is now also where retrofits are fitted, inspection findings are closed and owners judge cost and time control.
Special and intermediate surveys, and the required inspections of the ship's bottom in each five-year period, still set the rhythm of docking and its core work list.
Ballast water treatment, EEXI and CII efficiency measures and compliant anti-fouling are often fitted or renewed in dock.
Findings about hull, structure and equipment condition often have to be closed out in the yard, and inspectors expect to see that they were.
Defects found in port are often deferred to the next docking, so the dry-dock list records how they were resolved.
Both expect dry docks to be planned, controlled and reviewed afterwards, with lessons and costs fed back into the next project.
What dry docking is costing ship managers today
Schedules slip, costs spiral and reporting lags behind reality, while the vessel is off hire for every extra day in the yard.
Specifications built from scratch
Each docking starts with a new spreadsheet, even though most of the jobs are the same ones done last time.
Quotes that cannot be compared
Yard quotes come in different structures, so comparing them line by line takes days of superintendent time.
Costs that spiral unseen
Extra work is agreed on the dock floor and only shows up in the final invoice.
Reporting that lags reality
Daily progress is gathered by phone and email, so the office sees the position days after it has changed.
No history to learn from
Without comparable data from earlier dockings, there is little to challenge a yard's estimate or improve the next plan.
Spreadsheets, email and a superintendent's notebook, or one live project from specification to final cost
A dry dock should be planned from proven templates, run on a shared live plan and closed out with complete records and costs.
What sets Dry Dock X7 apart for your fleet
Built for all merchant ship types, from tankers and gas carriers to bulk carriers, container ships and car carriers, Dry Dock X7 is dry dock management software that keeps planning, execution and analysis in one place and in the simplest form, so the job gets done on time.
Quick, consistent planning
Templates and a standard jobs library let superintendents build a specification quickly and consistently.
Cost under control
Budget costs, compare quotes, track variances and approve ad-hoc requests in the same system as the work.
Works in the yard
Mobile apps work offline with online sync, so updates, certificates and pictures are captured where the work happens.
Clear accountability
Track the responsibility, accountability and expenses of personnel and superintendents throughout the project.
- Key features
- Unlimited dry-docking and shipbuilding projects
- Quick planning using templates and a standard jobs library
- Gantt charts to review workload and plan visually
- Daily, weekly and full-dock work plans
- Budget costs, compare quotes and track variances
- Inform key stakeholders of their tasks and updates
- Attach work-done certificates, pictures and scanned documents on the go
- Approve ad-hoc requests
- Accessible on mobile apps offline with online sync
- Accessible on the web, with a fully online web and mobile version
- Track personnel responsibility and accountability
- Track personnel and superintendent expenses
- Make informed decisions based on real-time data
- Use historical datasets to compare cost and work-done data
Shorter, safer, better-controlled dockings
The return from Dry Dock X7 comes from tighter control of scope and cost, faster decisions in the yard and better data for the next project.
Fewer cost surprises
Budgets, quote comparisons, variance tracking and approval of ad-hoc requests keep extra work visible and agreed before it is invoiced.
Faster decisions in the yard
Real-time progress, Gantt views and daily plans let superintendents and the office act on the current position, not yesterday's email.
Complete records for Class and owners
Certificates, pictures and documents attached on the go give a full record for survey close-out and owner reporting.
Patterns across dockings, and a tool that works on the dock floor
Every project adds to a history that makes the next docking easier to plan.
Historical comparison
Historical datasets let you compare cost and work done across vessels, yards and dockings to test a new estimate.
Budget versus actual
Live budget and actual cost by project show where variances are building while there is still time to act.
Designed for ships and superintendents
Offline mobile apps let superintendents update jobs and attach evidence from the dock floor.
Every dry-dock project, budget and milestone at a glance
The Dry Dock X7 dashboard brings project status, costs, progress and documents together for the whole fleet.

- Projects in planning, in progress and completed
- Budget versus actual cost by project, with cost variance
- Upcoming milestones and work progress summary
- Gantt chart snapshot, recent documents and activity log
Built by an ISO 9001, ISO 27001 and CMMI Level 3 certified team
Dry Dock X7 is part of Marine X7 by Synergetic Shipping Technologies, which is certified to ISO 9001:2015, ISO 27001:2022 and CMMI Level 3. In the same suite, PMS X7 is approved by ClassNK, DigiMoor X7 by ClassNK and RightShip, and Work-Ship by ClassNK, IRClass and RightShip.
- ISO 9001:2015 quality management
- ISO 27001:2022 information security
- CMMI Level 3
- Same suite as ClassNK approved PMS X7 and DigiMoor X7
- Work-Ship approved by ClassNK, IRClass and RightShip

Trusted by 70+ ship owners and managers
2,200+ ships use our software, and 3,100+ ships use our software and services every year, with 100% client retention.
Preferred by the World's Leading Ship Owners and Managers
With 100% client retention since inception, we're trusted by LNG, LPG, Oil, Chemical, Bulk, Container & Specialized Fleets globally.
Learn more about Dry Dock X7
Questions about Dry Dock X7
Still have a question? Ask us about your own fleet.
Ask our teamWhat is dry docking software?
Dry docking software is the system a ship manager uses to plan and control a dry dock: building the repair specification, comparing yard quotes, scheduling the work, tracking cost against budget and recording what was done. It replaces the spreadsheets, emails and notebooks that usually run a docking with one live project record.
What is Dry Dock X7?
Dry Dock X7 is a dry-docking and shipbuilding management tool from Synergetic Shipping Technologies. It covers planning with templates and a standard jobs library, Gantt charts and daily, weekly and full-dock work plans, budgets, quote comparison and variance tracking, ad-hoc request approval, and offline mobile apps for progress, certificates and pictures.
Which ships is Dry Dock X7 for?
Dry Dock X7 is for all merchant ship types: oil, product and chemical tankers, LNG and LPG carriers, bulk carriers, container ships, car carriers, general cargo and multipurpose ships. Superintendents use it in the yard, technical managers follow cost and progress ashore, and it handles unlimited dry-docking and shipbuilding projects.
How does Dry Dock X7 keep dry dock cost under control?
Dry Dock X7 keeps cost under control by putting budget, quotes and extra work in the same system as the job list. You budget costs, compare yard quotes, track variances and approve ad-hoc requests before work is done, and historical datasets let you challenge a new estimate against past dockings.
Does Dry Dock X7 work in the yard without internet?
Yes. Dry Dock X7 mobile apps work offline in the yard and sync when back online, so progress, work-done certificates, pictures and scanned documents are captured where the work happens. Like every Marine X7 product, it is also available as a fully online web and mobile version.
Can Dry Dock X7 manage newbuilding projects as well as dockings?
Yes. Dry Dock X7 supports unlimited dry-docking and shipbuilding projects. The same templates, Gantt charts, budgets, quote comparison and stakeholder updates apply, and personnel responsibility, accountability and superintendent expenses are tracked for each project, so one tool covers both repair and newbuilding work.
Can Dry Dock X7 be used on its own?
Yes. Dry Dock X7 runs standalone, and can later be connected to other Marine X7 modules such as PMS X7, Budget X7 and Procure X7. We load your historical data and files at set-up, so past dockings are ready for cost and work-done comparison from your first project.
See Dry Dock X7 on your next docking
Request a demo with the specification from your last or next dry dock and we will show you how it is planned and tracked in Dry Dock X7, or talk to our Marine Engineers first.