PMS database creation is building the data behind a ship's planned maintenance system: the equipment hierarchy and coding, maintenance jobs and intervals, critical equipment and linked spares. Our marine engineers build new databases from the maker's manuals, clean up existing ones and migrate them between platforms, ready to upload into AMOS, Sertica, ShipManager, TM Master, ShipNet, BASS, DNV Nauticus, PMS X7 and others, typically in under one month per vessel.

  • PMS database creation
  • PMS database cleanup
  • PMS data migration
  • SFI & company coding
  • Jobs & intervals
  • Spares mapping
  • Critical equipment
  • Fleet standardisation
  • 250+ PMS databases built
  • Typically under one month per vessel
  • Multiple vessels in parallel

Track record

250+PMS databases built
3,100+ships use our software and services every year
70+ship owners and managers as clients
100%client retention
Talk to our Marine Engineers
3,100+ships a year use our software & services
70+ship owners & managers
100%client retention
Approvals: ClassNK, IRClass, RightShip, Marshall Islands Registry, ISO 9001:2015, ISO 27001
What has changed

Your PMS is now inspected as evidence

A planned maintenance system used to be judged by whether the ship had one. Today inspectors, auditors and surveyors open it, pick an equipment item and ask the crew to prove the record is true.

ISM Code

The company must maintain the ship in line with the rules and its own procedures, and identify equipment whose sudden failure could cause a hazardous situation. The PMS is where that is shown.

Class

Machinery survey arrangements based on a planned maintenance system depend on records that match the equipment actually installed on board.

SIRE 2.0

Inspectors ask how maintenance is planned and verified, then compare the answer with overdue jobs, open defects and the critical equipment list.

RightShip RISQ 3.2

Dry bulk inspections look at equipment condition and the maintenance and defect records behind it.

TMSA 3 & DryBMS

Both expect a structured maintenance system with critical equipment identified and performance measured, so the KPIs coming out of the PMS must be believable.

The risk of waiting

What a poor PMS database costs you

A PMS is only as good as the data underneath it. Once engineers stop trusting the database, planned maintenance quietly stops happening.

  • Phantom overdue jobs

    Duplicated, misconfigured or orphaned tasks inflate overdue figures that auditors and vetting inspectors read as poor maintenance.

  • Intervals nobody can justify

    Jobs set by habit rather than maker guidance leave equipment over-maintained in one place and run to failure in another.

  • One-line job cards

    A task that just says "overhaul pump" sends the engineer back to a manual on a shelf, so steps get skipped and records get vague.

  • Spares that do not trace

    Parts not linked to their equipment and maker part number make requisitions hard to justify and leave critical spares missing when needed.

  • Every vessel built differently

    Different names, codes and structures for the same equipment mean no fleet view, no sister-ship comparison and messy procurement.

What a poor PMS database costs you
What you get

What you get from PMS database creation or cleanup

Whether we build from scratch, clean what you have or move you to a new platform, the result is a structured, verified database your engineers can work from on day one.

01

Equipment hierarchy with SFI or company coding

Every maintainable item structured by system and function, from main engine down to pumps, valves and safety equipment, coded with SFI or your company coding from our central library.

02

Executable job plans

Maintenance tasks built from the maker's manuals, written as instructions an engineer can follow rather than one-line reminders, each attached to the right equipment.

03

Intervals, counters and running hours

Calendar intervals, running-hour triggers and counters set to maker and Class guidance, with critical jobs scheduled so they cannot slip unnoticed.

04

Critical equipment and Class layer

Critical equipment flagged in line with the ISM Code with test routines attached, Class jobs and survey items mapped, and certificate-linked tasks tied to their cycles.

05

Spares and drawings linked to equipment

Spares linked to their parent equipment with maker part numbers, and maker drawings attached to the equipment, jobs and spares they belong to.

06

Historical records migrated

Past maintenance history carried across from your old system or records, so running hours, last-done dates and job history continue in the new database.

07

Cleanup of an existing database

Duplicates removed, intervals corrected against maker and Class guidance, running-hour and counter errors fixed, and entries for equipment no longer on board taken out.

08

Migration to your PMS platform

Software-ready files for AMOS, Sertica, ShipManager, TM Master, ShipNet, BASS, DNV Nauticus, PMS X7 and others, with a trial import before the final upload.

09

Fleet templates, validation report and training

Fleet-wide templates for sister vessels, a validation report recording what was built or changed and why, a named project manager and training for your office staff.

Is your PMS producing inspection findings instead of preventing them?Talk to our Marine Engineers
How it works

How PMS database creation works: four steps, under one month per vessel

We do the heavy lifting with your manuals and records, so your engineers can keep running the ship.

  1. 1

    Discovery and gap review

    We review your existing PMS export, equipment list, machinery particulars, maker manuals and Class status, and list the gaps, duplicates and missing documents.

  2. 2

    Build or correct

    The hierarchy, coding, job plans, intervals, Class jobs, critical equipment, drawings and spares links are built or corrected, with an AI tool reading the manuals and our engineers checking the result.

  3. 3

    Validation

    Each database passes a documented quality review: intervals checked against maker guidance, duplicates eliminated and cross-references verified, supported by AI-assisted checks.

  4. 4

    Trial import, upload and handover

    A trial import into your PMS is checked before the final upload. We then deliver the files with the validation report and train your office staff.

Delivery is typically under one month per vessel, and multiple vessels can be built in parallel. Sister vessels move faster once the first database is built, because validated jobs and spares carry across. Where maker documentation is missing, we reconstruct sound intervals from guidance for equivalent equipment and record the basis.

Why Synergetic

Why fleets choose Synergetic for PMS database creation

We are marine engineers and mariners who also build ClassNK approved PMS software, so we know what a database has to prove under inspection and how it is used in the engine room.

250+PMS databases built
3,100+ships use our software and services every year
70+ship owners and managers as clients
100%client retention

Built by people who used a PMS at sea

Databases are built by marine engineers and technical superintendents, backed by a dedicated team for database building and migration.

A central library, not a blank page

We keep a central library of equipment, jobs and spares with SFI coding, so every new vessel starts from previously validated data. 250+ PMS databases have been built this way.

Software-agnostic

We work with whichever established PMS your fleet runs, and if you move to PMS X7 the same team builds and migrates your data.

Your data stays protected

Synergetic Shipping Technologies is certified to ISO 27001:2022 and ISO 9001:2015, and appraised at CMMI Level 3.

A PMS your engineers and inspectors can both trust

KPIs management can believe

Overdue figures reflect real maintenance, not phantom or misconfigured tasks.

Defensible under inspection

When an inspector pulls a critical equipment history, the records, the critical equipment list and your SMS tell the same story.

Evidence of data provenance

The validation report you keep documents how the database was built, what was corrected and on what basis.

Who it is for

Who PMS database creation is for

For technical superintendents, fleet technical managers, chief engineers and the teams taking over newbuilds, acquired tonnage or vessels changing PMS platform. We build databases for every merchant ship type.

  • Oil tankers
  • Product tankers
  • Chemical tankers
  • LNG carriers
  • LPG carriers
  • Bulk carriers
  • Container ships
  • Car carriers
  • General cargo ships
  • Multipurpose ships
Approvals and clients

Trusted by 70+ ship owners and managers

ISO 9001:2015, ISO 27001:2022 and CMMI Level 3. Our DigiMoor X7 and Work-Ship software are approved by Class and RightShip.

  • 3,100+ ships use our software and services every year
  • 100% client retention
Approvals and certifications: ClassNK, IRClass, RightShip, The Marshall Islands Registry, ISO 9001:2015 and ISO 27001

Preferred by the World's Leading Ship Owners and Managers

With 100% client retention since inception, we're trusted by LNG, LPG, Oil, Chemical, Bulk, Container & Specialized Fleets globally.

AMPTC - Arab Maritime Petroleum Transport Company
International Andromeda Shipping
Carbon Shipping
Dockendale
Fleet Management Limited
Fratelli Cosulich Marine Energy
The Great Eastern Shipping Co. Ltd.
Ishima
K Line - Kawasaki Kisen Kaisha
MISC Berhad
MM Solutions
MOL - Mitsui O.S.K. Lines
Orkim
Red Sea Marine
SalusTech Maritime Safety
SCI - Shipping Corporation of India
Seven Islands Shipping Limited
Thenamaris
Wilhelmsen
Meiji Shipping Group
Minerva Marine Inc.
Hafnia
Scorpio Group
Bahri
BSM - Bernhard Schulte Shipmanagement
Nakilat
AMPTC - Arab Maritime Petroleum Transport Company
International Andromeda Shipping
Carbon Shipping
Dockendale
Fleet Management Limited
Fratelli Cosulich Marine Energy
The Great Eastern Shipping Co. Ltd.
Ishima
K Line - Kawasaki Kisen Kaisha
MISC Berhad
MM Solutions
MOL - Mitsui O.S.K. Lines
Orkim
Red Sea Marine
SalusTech Maritime Safety
SCI - Shipping Corporation of India
Seven Islands Shipping Limited
Thenamaris
Wilhelmsen
Meiji Shipping Group
Minerva Marine Inc.
Hafnia
Scorpio Group
Bahri
BSM - Bernhard Schulte Shipmanagement
Nakilat
Software that keeps you compliant afterwards

Run the new database on a PMS built for compliance

PMS X7 is a ClassNK approved planned maintenance system linked to our central equipment, jobs and spares library, with Procure X7 turning spares needs into requisitions and Dry Dock X7 planning yard work.

Resources and articles

Learn more about PMS database creation

FAQ

Questions about PMS database creation

Talk to our Marine Engineers

Tell us about your fleet and we will answer directly.

Talk to our Marine Engineers
What is PMS database creation?

PMS database creation is building the data behind a ship's planned maintenance system: the equipment hierarchy and coding, maintenance jobs, calendar and running-hour intervals, critical equipment and linked spares. Synergetic builds it from maker manuals and Class requirements, or cleans and migrates an existing database, and hands over software-ready files with a validation report.

How long does PMS database creation take?

Delivery is typically under one month per vessel, and multiple vessels can be built in parallel. Sister vessels move faster once the first database is validated. Synergetic has built 250+ PMS databases, and every engagement has a named project manager, a trial import before the final upload and training for your office staff.

Which PMS software do you work with?

The service is software-agnostic. We deliver data formatted for AMOS, Sertica, ShipManager, TM Master, ShipNet, BASS, DNV Nauticus, our own PMS X7 and others. If you are changing platform, the same engagement serves as the migration: the data is cleaned on the way across and a trial import is checked before the final upload.

Can you clean up an existing PMS database instead of rebuilding it?

Yes, and it is often the right choice. A cleanup checks the hierarchy against the vessel's equipment list, removes duplicated and orphaned entries, corrects intervals against maker guidance, fixes running-hour and counter errors and relinks spares. You receive a validation report showing what changed and why, which also serves as evidence of data integrity.

What documents do you need from us?

Ideally the maker's manuals for major equipment, the equipment list or machinery particulars, Class survey status, any existing PMS export and current spares records. Gaps are normal. Part of the work is identifying missing documents and reconstructing sound intervals from guidance for equivalent equipment where originals are lost, with the basis recorded.

Do you use SFI coding?

Yes, and we can apply your company coding instead. Our team works from a central library of equipment, jobs and spares maintained with SFI coding, so the same equipment carries the same code on every vessel. That makes sister-ship comparison, fleet reporting and spares procurement far more reliable than databases built differently on each ship.

How is critical equipment identified in the database?

Against the ISM Code requirement to identify equipment and systems whose sudden failure may result in a hazardous situation, assessed by consequence. Critical items are flagged with test and standby-verification routines attached, so your critical equipment list, its maintenance evidence and your safety management system all tell the same story under audit.

Can you standardise PMS data across a whole fleet?

Yes. We build fleet-wide master templates with the same equipment names, SFI codes and job structures, then adjust each vessel for its actual equipment. Sister vessels move faster once the first database is validated, and the office gains a consistent view of maintenance, overdue jobs and spares across every ship.

Get in touch

Talk to our Marine Engineers about your PMS data

Tell us your fleet, your PMS platform and what is going wrong, and our marine engineers will propose a build, cleanup or migration plan for one vessel or the whole fleet.

Let's Enhance Your Maritime Compliance
and Operational Safety

Connect with our experts to explore how Synergetic's powerful digital solutions can elevate your fleet's compliance, streamline inspections, and strengthen operational safety — backed by real-time data insights and seafarer-driven innovation.

Why Maritime Leaders Choose Synergetic:

  • Class and RightShip accredited solutions aligned with OCIMF, TMSA, DRYBMS, and Flag requirements
  • Smart AI Powered analytics delivering instant compliance insights and audit-ready documentation
  • Proven track record across 3,100+ ships every year and multiple compliance frameworks
  • Continuous innovation led by seafarers, auditors, and maritime data specialists

For direct enquiries, reach out to [email protected]

We're Ready When You Are – Let's Talk

Please complete the form and our team will get back to you shortly with personalized support.